Why mining operations choose rope access
Scaffolding inside an operating plant means long assembly times, blocked routes and extended shutdown windows. Rope access crews mobilize in hours, work above live areas under a documented permit and demobilize without leaving structures behind.
- Shorter shutdown windows and faster mobilization
- No scaffolding assembly inside operating areas
- Access to silos, chutes, crushers and conveyor galleries
- Crews trained for both height (NR-35) and confined spaces (NR-33)
What we do on mining sites
- Internal and external cleaning of silos, hoppers and transfer chutes
- Structural maintenance and anti-corrosion painting of steel structures, towers and conveyor galleries
- Technical inspection of structures at height with photographic reports
- Installation of permanent lifelines and anchor points for your own maintenance teams
- Support during scheduled shutdowns with multiple crews
Compliance your HSE team can audit
Every job starts with a risk assessment (APR) and a work permit integrated into your site permit system. Our technicians hold IRATA certification and Brazilian NR-35 and NR-33 training, the service is covered by liability insurance and an engineering responsibility note (ART), and all documentation can be delivered in English for corporate review.
Get in touch
Write in English and you will get an answer in English, directly from our management. No translators, no delays. For urgent matters, WhatsApp is the fastest channel.